Unrelated, but the title made me think of this video where AT&T failed over old switch frames to new ones by manually cutting all the cable bundles, very dramatic.
https://www.youtube.com/watch?v=saRir95iIWk (Speedy Cutover Service, SXS switching cutover to ESS filmed live at Glendale CA central office, 1984)
Wait... So that's why it's called "cutover"? Amazing.
That was super interesting to watch. Only 4 mins long. The supervisor was visibly sweating during the cutover.
I'd love to see something similar at GCP or AWS.
"Wait, there is a problem, fallback now!"
They must have built high confidence beforehand! Hats off!